This series of speakers are weatherproof outdoor column speakers with a 70V/100V transformer built in. The 70V/100V transmission is realized in a high-voltage, low-current mode, which makes longer distance transmission and parallel connection of multiple loudspeakers possible. It can be applied to outdoor occasions vary in area sizes and background noises, such as station, park, school, square, military camp, industrial park, beach, etc.

Model | DSP158 | DSP258 | DSP358 | DSP458 | |
Driver Unit | 8”×1,1.4”×1 | 8”×2,1.4”×1 | 8”×3,1.4”×1 | 8”×4,1.4”×2 | |
Rated Power | 40W | 80W | 120W | 160W | |
Rated Voltage | 70V | 20W-40W | 40W-80W | 60W-120W | 80W-160W |
100V | 40W | 80W | 120W | 160W | |
Sensitivity (1m, 1W) | 91dB±2dB | 92dB±2dB | 93dB±2dB | 94dB±2dB | |
Frequency Response | 80Hz-16kHz | 80Hz-16kHz | 80Hz-16kHz | 80Hz-16kHz | |
Max. SPL (1m) | 107dB±2dB | 111dB±2dB | 114dB±2dB | 116dB±2dB | |
Dimension (H×W×D) | 435×248×238mm | 670×248×238mm | 910×248×238mm | 1325×248×238mm | |
DSP358 Outdoor Waterproof Column SpeakerNovember 16, 2016Description:This series of speakers are weatherproof outdoor column speakers with a 70v/100v transformer built in. The 70v/100v transmission is realized in a high-voltage, low-current mode, which make...view
DSP408 Outdoor Waterproof Column SpeakerNovember 15, 2016Description:DSP408 is an outdoor waterproof column speaker built-in 70v/100v transformer. The 70v/100v transformer technique reduces line losses on longer distance and allows easy parallel connection ...view
FAQs About Column SpeakersMay 7, 2026viewwe will contact you within 24 hours.
The Difference Between Digital Conference System and Intelligent Conference SystemMay 24, 2021Conference system equipment generally consists of projection display equipment, central control equipment, conference speech equipment, loudspeaker equipment, monitoring equipment, lighting effect equ...view
DSPPA | Holiday Schedule: Dragon Boat Festival 2026June 17, 2026Abstract: DSPPA will observe the Dragon Boat Festival holiday from June 19 to June 21, 2026, and resume normal operations on June 22.view